About This Project
Metal Core Limited was contracted by IRCON International Ltd. to deliver the supply, fabrication, and erection of passenger platform sheds across 8 railway stations — along with foot-over bridges at 2 key stations — as part of the Khulna-Mongla Port Rail Line Project in Bangladesh.
The project required precision engineering to meet railway-grade structural standards, with all steel components fabricated at our Narshingdi factory and erected on-site within a 9-month delivery window.
This project stands as one of Metal Core Limited’s landmark infrastructure achievements, demonstrating our capacity to deliver large-scale, multi-site government and international-grade contracts.
CHALLENGE
The Problem We Solved.
Coordinating simultaneous structural steel erection across 8 geographically spread railway stations — each with active rail traffic — required strict sequencing, precision logistics, and adherence to Bangladesh Railway safety protocols.
All work had to be completed without disrupting the operational rail corridor.
SOLUTION
How Metal Core Delivered.
We implemented a phased fabrication schedule — completing all components at our factory before mobilising to each station in sequence. This allowed parallel progress across sites and minimised on-site disruption.
Dedicated site supervisors at each station ensured quality control, timeline adherence, and seamless coordination with IRCON’s railway operations team.
What We Delivered
-
01
Site Survey & Engineering Design
Full topographic survey and structural engineering drawings for all 8 stations.
-
02
Steel Fabrication at Narshingdi
All components fabricated at our Narshingdi factory to railway-grade specifications.
-
03
Quality Control & Testing
Full QC inspection at fabrication stage — dimensional checks, weld inspection, and load testing.
-
04
Transport & Site Logistics
Coordinated logistics to all 8 station sites along the Khulna-Mongla corridor.
-
05
Erection & Handover
On-site erection, final QC walk, and formal project handover to IRCON within 9 months.
HIGHLIGHTS
-
8
STATIONS
Passenger platform sheds erected across the rail corridor
-
2
BRIDGES
Foot-over bridges designed, fabricated, and installed
-
9
MONTHS
Complete project delivery from mobilisation to handover
-
100%
IN-HOUSE
Design, fabrication, and erection — no subcontracting