Khulna-Mongla Port Rail Line

01
PROJECT OVERVIEW

About This Project

CHALLENGE

The Problem We Solved.


Coordinating simultaneous structural steel erection across 8 geographically spread railway stations — each with active rail traffic — required strict sequencing, precision logistics, and adherence to Bangladesh Railway safety protocols.

All work had to be completed without disrupting the operational rail corridor.

SOLUTION

How Metal Core Delivered.


We implemented a phased fabrication schedule — completing all components at our factory before mobilising to each station in sequence. This allowed parallel progress across sites and minimised on-site disruption.

Dedicated site supervisors at each station ensured quality control, timeline adherence, and seamless coordination with IRCON’s railway operations team.

03
SCOPE OF WORK

What We Delivered

  1. 01

    Site Survey & Engineering Design

    Full topographic survey and structural engineering drawings for all 8 stations.

  2. 02

    Steel Fabrication at Narshingdi

    All components fabricated at our Narshingdi factory to railway-grade specifications.

  3. 03

    Quality Control & Testing

    Full QC inspection at fabrication stage — dimensional checks, weld inspection, and load testing.

  4. 04

    Transport & Site Logistics

    Coordinated logistics to all 8 station sites along the Khulna-Mongla corridor.

  5. 05

    Erection & Handover

    On-site erection, final QC walk, and formal project handover to IRCON within 9 months.

04
PROJECT HIGHLIGHTS
  • 8

    STATIONS

    Passenger platform sheds erected across the rail corridor

  • 2

    BRIDGES

    Foot-over bridges designed, fabricated, and installed

  • 9

    MONTHS

    Complete project delivery from mobilisation to handover

  • 100%

    IN-HOUSE

    Design, fabrication, and erection — no subcontracting